For shippers
Freight that has to be measured before it’s priced
Six service lines, any trailer the load needs, four verticals, and the paperwork that comes with each.
What we haul
Six service lines across manufacturing, construction, oil & gas, agriculture and seasonal freight. Each has its own paperwork, and we do that part.
Full truckload
Thousands of truckloads a year, delivering to off-grid job sites and city centers.
Dry · Flat · ReeferOver-dimensional & heavy haul
Loads over legal width, height or weight. Permits, route surveys and escorts arranged state by state.
Permitted · EscortedHazmat
Explosives, flammables and regulated commodities. Endorsed drivers, placarding and shipping papers checked against the load, not assumed.
Endorsed · PlacardedHot shot
Nights, early mornings and weekends, on dedicated equipment rather than whatever is spare.
ExpeditedLess than truckload
Partial loads and freight that does not fill a trailer, priced against the space it actually takes.
LTL · PartialPersonal items
Vehicles, equipment and household freight that doesn't fit a standard carrier's rules.
SpecialtyFour verticals we know the paperwork for
Each one fails in its own way — a permit that expires mid-route, a placard that does not match the manifest, a job site with no forklift. We plan for the one in front of us.
Government & defense
Freight that arrives with its documentation in order, because the contract is written that way.
Compliance-ledEnergy
Oilfield call-outs, drilling equipment and rig moves, including sites a standard carrier will not run to.
Permian · Gulf CoastConstruction & equipment
Excavators, dozers, cranes and building material — on the deck that carries it legally.
RGN · Step deckIndustrial & manufacturing
Steel, pipe and plant equipment on a schedule a production line can plan around.
Flatbed · DryWhatever deck it needs, with the numbers that matter
Most of what we move is measured before it’s priced. These are the decks we run most, and what each one legally carries — if the load needs something else, we source it.
| Trailer | Deck length | Width | Legal payload | Typical freight |
|---|---|---|---|---|
| Flatbed | 48' – 53' | 102" | 48,000 lb | Steel, pipe, lumber, palletized building material |
| Step deck | 48' – 53' | 102" | 48,000 lb | Loads over 8'6" tall that won't clear on a flat |
| RGN / lowboy | 29' well | 102" | 40,000 – 150,000 lb | Excavators, dozers, transformers, drilling equipment |
| Hot shot | 40' gooseneck | 102" | 16,500 lb | Expedited, partial, oilfield call-outs |
| Reefer | 53' | 102" | 44,000 lb | Temperature-controlled and protect-from-freeze |
| Power only | — | — | Trailer rated | Your trailer, our tractor and driver |
How a load actually runs
Four steps, one point of contact.
Tell us the freight
Dimensions, weight, pickup and delivery. Photos help if it's odd-shaped.
We price it
A real rate against current capacity on that lane, with permits costed in.
We cover and secure it
Vetted carrier, insurance verified, securement matched to the commodity.
You get updates, not silence
Tracking where it exists, a call where it doesn't, and the POD when it lands.
Coverage
North America, run out of four offices
Domestic and cross-border freight throughout the United States, Canada, Alaska and Mexico, including cross-border paperwork.

Why we can answer the question
Every quote, load and invoice lives in one system of record. That is what makes an answer about your freight checkable instead of reassuring.
Set up online in minutes
Our customer application runs start to finish in a browser. Credit terms, the master services agreement and signatures, without a PDF round trip.
Self-service onboardingCarrier onboarding that doesn't stall
Insurance, authority and safety scores verified up front, so the first load moves instead of waiting on paperwork.
Qualified carriersOne version of the truth
Every load, quote and invoice lives in one system. When you ask where a load is, the answer comes from the record.
Integrated systemsRequest a quote
Send us the dimensions.
We’ll send back a rate.
No login required. If it’s permitted or hazmat, say so and we’ll price the permits with it.
- Flatbed
- Step deck
- RGN
- Hot shot
- Reefer
- Hazmat
